Basic
structure
The
standard arrangement is according to the diagram at right. The
testing chamber and the main chamber part of the door, the heater,
cooling coil and circulating fan are combined to make the
conditioning unit.
Then
the temperature and humidity adjusting control panel and
refrigerator are installed to complete the overall structure of
the unit.
Other
equipment includes the power supply, the water supply and waste
water systems, the method of putting the sample in to the chamber,
etc.
In
addition, the number of persons and safety of the personnel who
will be going in and out of the chamber are important determining
factors.
The
main feature of this system is that while referring to the basic
structure, design and manufacture can be carried out to match the
installation location and the type of items to be tested.
|